Replacement Of Filter Press 247 - Litre / Cycle Press With Double Acting Hydroulic Cylinder Motorised Hydroulic Power Pack

Water & Waste Water Treatment (EPC)

June 27, 2023

Tambun, Bekasi

project-img

Project Overview

This project involved the replacement of an existing 247-liter-per-cycle filter press unit at PT Suzuki Indomobil Motor Plant Tambun I. The upgrade was implemented to improve operational reliability and dewatering performance within the plant’s wastewater treatment facility.
The new filter press is equipped with a double-acting hydraulic cylinder and a motorised hydraulic power pack, enabling safer, more stable, and more controlled operation. All activities were carefully planned to ensure uninterrupted plant operations.

Project Objective
The objective of this project was to enhance the performance and reliability of the wastewater treatment process by upgrading critical dewatering equipment. The replacement aimed to improve system stability, operational efficiency, and long-term equipment reliability in support of automotive manufacturing operations.

Project Scope

  1. Engineering Assessment and Preparation

    • Evaluation of existing filter press condition and performance

    • Identification of upgrade and integration requirements

    • Engineering adjustments for new unit installation

  2. Filter Press Replacement

    • Supply of a 247-liter-per-cycle filter press with a double-acting hydraulic cylinder

    • Integration of a motorised hydraulic power pack

    • Dismantling of the existing unit and installation of the new system

  3. Hydraulic, Mechanical, and Electrical Integration

    • Hydraulic system modification and integration

    • Mechanical and electrical adjustments

    • Functional checks before commissioning

  4. Testing and Commissioning

    • System start-up and operational testing

    • Verification of pressure, cycle time, and dewatering performance

    • Confirmation of compliance with design and safety standards
       

Key Outcomes

  • Improved dewatering efficiency
  • More stable and controllable system operation
  • Increased equipment reliability and operational safety
  • Support for long-term wastewater treatment performance

Project Gallery

gallery
gallery
gallery
gallery
gallery
gallery
gallery
gallery
gallery
gallery
gallery
gallery

Project Information

Client

PT Suzuki Indomobil Motor Plant Tambun I

Location

Tambun, Bekasi

Start Date

June 27, 2023

Duration

14 Days

Industry

Automotives

Ready to Start Your Project?

Our team of experts is ready to help you achieve your operational goals