September 13, 2024
MM 2100, Bekasi
This project involved the refurbishment of boiler steam trap piping at PT Hogy Indonesia to improve the reliability and safety of the steam system. The scope focused on replacing deteriorated steam trap piping to ensure efficient condensate removal and stable steam distribution. All works were carefully planned and executed without disrupting ongoing production activities.
Project Objective
The objective of the project was to enhance boiler system efficiency, operational safety, and long-term reliability by restoring proper steam trap piping functionality.
Project Scope
Engineering Assessment and Planning
Evaluation of existing steam trap piping condition
Identification of piping sections requiring replacement
Planning aligned with boiler operating requirements
Steam Trap Piping Replacement
Removal of deteriorated steam trap piping
Installation of new piping with proper alignment and support
Integration with existing boiler and steam systems
Key Outcomes
Improved condensate removal efficiency
Reduced steam leakage and energy loss
More stable, safe, and reliable boiler operation
PT Hogy Indonesia
MM 2100, Bekasi
September 13, 2024
2 Days
Pharmaceuticals