May 10, 2024
MM 2100, Bekasi
This project involved the replacement of an existing chiller system at PT Hogy Indonesia to improve cooling reliability for medical equipment manufacturing processes. The scope of work included the supply and installation of an Orion Chiller. All activities were executed within a short timeframe and carefully planned to avoid disruption to ongoing plant operations.
Project Objective
The objective of this project was to ensure stable and reliable temperature control by upgrading the existing cooling system, supporting consistent operating conditions required in medical equipment production.
Project Scope
Engineering Review and System Preparation
Assessment of existing chiller performance and operating conditions
Evaluation of required cooling capacity
Preparation for system replacement and integration
Supply and Installation of Orion Chiller
Supply of a new Orion Chiller unit
Removal of the existing chiller
Installation and positioning of the new unit
Mechanical, Electrical, and Utility Integration
Connection of piping and cooling circuits
Electrical connection and system configuration
Integration with existing plant utilities
Testing and Commissioning
Functional testing of chiller operation
Verification of cooling performance and system stability
Confirmation of operation in accordance with design requirements
Key Outcomes
Stable and reliable cooling performance
Improved temperature control for production processes
Enhanced system reliability and operational efficiency
PT Hogy Indonesia
MM 2100, Bekasi
May 10, 2024
3 Days
Pharmaceuticals