Refurbishment of Boiler Fuel Pipe

MPS (Welder, Mechanic, Technician)

December 20, 2023

MM 2100, Bekasi

project-img

Project Overview

This project involved the refurbishment of the boiler fuel piping system at PT Hogy Indonesia to improve safety and operational reliability. The work focused on replacing degraded fuel piping that had been affected by long-term operation. The refurbishment ensured a stable fuel supply and supported safe boiler performance. All activities were executed in accordance with applicable technical and safety standards.

Project Objective
The objective of the project was to enhance boiler safety and reliability by restoring the integrity of the fuel piping system.

Project Scope

  1. Assessment and Refurbishment Planning

    • Evaluation of existing boiler fuel pipe condition

    • Identification of degradation and potential safety risks

    • Planning of pipe replacement based on boiler operating requirements

  2. Boiler Fuel Pipe Replacement

    • Dismantling of existing fuel piping

    • Installation of new fuel piping with suitable materials and specifications

    • Connection and alignment with the existing boiler fuel system


Key Outcomes

  • Improved fuel flow stability

  • Reduced risk of leakage and system failure

  • Enhanced boiler safety and operational reliability

Project Gallery

gallery
gallery

Project Information

Client

PT Hogy Indonesia

Location

MM 2100, Bekasi

Start Date

December 20, 2023

Duration

11 Days

Industry

Pharmaceuticals