New DI Water System Cap. 3 m3/h

Water & Waste Water Treatment (EPC)

February 14, 2025

MM 2100, Bekasi

project-img

Project Overview

This project involved the fabrication and installation of a new Deionized (DI) Water System with a capacity of 3 m³/h for PT Rayovac Battery Indonesia. The system was designed to supply the high-purity water required for battery manufacturing processes. An automatic mix-bed system was implemented with integrated mechanical, electrical, and instrumentation components to ensure stable operation and consistent water quality.

Project Objective
The objective of this project was to provide a reliable and automated DI water system that meets battery industry water quality standards while ensuring operational efficiency, process stability, and long-term system reliability.

Project Scope

  1. DI Water System Engineering and Design

    • Design of a 3 m³/h automatic mix-bed system

    • Alignment with battery production water quality requirements

    • Integration of mechanical, electrical, and instrumentation systems

  2. Fabrication and Installation of Main Equipment

    • Fabrication and installation of mix-bed and product tanks

    • Installation of pumps, piping, and resin regeneration systems

    • Loading of cationic and anionic resins

  3. Electrical, Instrumentation, and Automation System

    • Installation of PLC and HMI control panels

    • Installation of pH and conductivity sensors

    • Integration of automated monitoring and control systems

  4. Supporting Civil Works

    • Construction of the bund wall and sump pit

    • Preparation of foundations and installation area

    • Compliance with safety and environmental standards

  5. Testing and Commissioning

    • Verification of DI water capacity and quality

    • Functional testing of automation and control systems

    • System handover in a ready-to-operate condition


Key Outcomes

  • Reliable supply of high-purity DI water

  • Stable and automated system operation

  • Consistent water quality meeting battery industry standards

  • Improved utility reliability for production processes

Project Gallery

gallery
gallery
gallery
gallery
gallery
gallery

Project Information

Client

PT Rayovac Battery Indonesia

Location

MM 2100, Bekasi

Start Date

February 14, 2025

Duration

34 Days

Industry

Electronics

Ready to Start Your Project?

Our team of experts is ready to help you achieve your operational goals