Quality & productivity of Demin Water No. 02 include material as follows: Upgrading Demin Water

Water & Waste Water Treatment (EPC)

August 01, 2022

Tambun, Bekasi

project-img

Project Overview

This project focused on improving the quality and productivity of Demineralized Water System No. 02 through a system upgrade. A Reverse Osmosis (RO) unit was installed as a pretreatment for ion exchange feed water to enhance feed quality and stabilize system performance. All activities were carefully planned and executed without disrupting ongoing plant operations. The upgrade supports long-term operational reliability and efficiency.

Project Objective
The main objective of this upgrade was to reduce the operational load on the ion exchange system by improving feed water quality. The RO pretreatment system was implemented to decrease regeneration frequency and chemical consumption while maintaining consistent demineralized water quality.

Project Scope
1. Engineering Assessment

  • Evaluation of the existing demineralized water system condition and performance

  • Identification of operational limitations and integration requirements

  • Engineering design for RO system integration

2. RO System Installation & Integration

  • Installation of the RO unit as pretreatment for ion exchange feed water

  • Integration with existing piping, control systems, and process flow

3. Commissioning & Performance Testing

  • System start-up and operational testing

  • Verification of flow rate, pressure, water quality, and system stability


Key Outcomes

  • Reduced ion exchange resin regeneration frequency
  • Lower consumption of regeneration chemicals (acid and caustic)
  • More consistent demineralized water quality
  • Improved system productivity and operational stability
  • Reduced operating costs and improved environmental performance

Project Gallery

gallery
gallery
gallery
gallery
gallery
gallery

Project Information

Client

PT Suzuki Indomobil Motor Plant Tambun I

Location

Tambun, Bekasi

Start Date

August 01, 2022

Duration

91 Days

Industry

Automotives