Fabrication and installation of Sand Filter and Pressure Tank Cap. 4 and 8 m3/h

Water & Waste Water Treatment (EPC)

May 15, 2025

Tambun, Bekasi

project-img

Project Overview

This project involved the fabrication and installation of three sand filter units at PT Suzuki Indomobil Motor Plant Tambun I to enhance domestic water supply quality and reliability. Two units have a capacity of 4 m³/h, and one unit has 8 m³/h. The work included pressure tank fabrication, tank foundation construction, pump and piping installation, as well as electrical and control system integration. System reliability and operational stability were key priorities throughout the project.

Project Objective
The objective was to provide a stable domestic water supply that meets operational standards while ensuring long-term system reliability. The project aimed to optimize water filtration performance, improve system efficiency, and deliver a fully integrated solution for the facility.

Project Scope

  1. Engineering and System Planning

    • Determine sand filter capacities and configuration

    • Design system based on domestic water demand

    • Adjust design to existing facility conditions

  2. Fabrication and Civil Works

    • Fabrication of pressure tanks

    • Construction of tank foundations

    • Site preparation for system installation

  3. Mechanical and Piping Installation

    • Install pumps and piping networks

    • Integrate sand filters into the domestic water system

    • Ensure proper mechanical alignment for smooth flow

  4. Electrical and Control System Installation

    • Install electrical panels and components

    • Integrate control and protection systems

    • Conduct functional testing of electrical systems

  5. Testing, Commissioning, and Reliability Verification

    • Test flow capacity, operating pressure, and filtration quality

    • Verify system performance against design criteria

    • Ensure improved reliability and a stable domestic water supply
       

Key Outcomes

  • Reliable and stable domestic water supply

  • Optimized filtration and water quality

  • Fully integrated civil, mechanical, and electrical systems

  • Long-term operational sustainability

  • Compliance with industrial quality and safety standards

Project Gallery

gallery
gallery
gallery
gallery
gallery
gallery

Project Information

Client

PT Suzuki Indomobil Motor Plant Tambun I

Location

Tambun, Bekasi

Start Date

May 15, 2025

Duration

95 Days